-
Cleaning of the drains

-
Painting of fences –inside the community
-
Installation of bulletin Boards

-
Installation of “We Care signs”

-
Installation of 2 Stops signs- block 4

-
Re-painting of decorative parking
deterrent in the Community

-
Re-painting of walls around the drains
-
Finish repairing fences -inside homes

-
Replacement of door at park -block 2

-
Replace park fence with 6 foot steel
fence- block 4

-
Repair concrete circles in the community

-
Build concrete circles in areas that
don’t have them

-
Paint the concrete squares around
electrical boxes

-
Repair the squares around electrical post
(if needed)

-
Paint mail boxes

-
Solar lights (maintenance)

-
Trim trees – around community

-
Paint sea walls

-
Stain the fences by the public park

-
Replacement of recreational equipment in
both parks and sand
-
Build walls around drains –to avoid leafs
& dirt
-
Irrigation solution for the common areas
